Carrier GY Instruções de Operação Página 1

Consulte online ou descarregue Instruções de Operação para Aparelhos de ar condicionado "split system" Carrier GY. Carrier GY Operating instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
1
30GV/30GY 020-059
Air-Cooled Liquid Chillers
50 Hz
Installation, Operation and Maintenance Instructions
Vista de página 0
1 2 3 4 5 6 ... 19 20

Resumo do Conteúdo

Página 1 - 30GV/30GY 020-059

130GV/30GY 020-059Air-Cooled Liquid Chillers50 HzInstallation, Operation and Maintenance Instructions

Página 2

10Water connectionsRefer to the certified dimensional drawings for the sizes andpositions of all water inlet and outlet connections. The waterpipes mu

Página 3

11Water connections (30GY/GV 044-059)There are two alternatives:- Water entering at the left of the duplex unit and leaving onthe right.- Water enteri

Página 4 - 30GV/30GY 025-035

12Power supplyThe power supply must conform to the specification on thechiller nameplate. The supply voltage must be within the rangespecified in the

Página 5 - 30GV/30GY 044-059

13Actual start-upIMPORTANT:• Commissioning and start-up of the chiller must besupervised by a qualified refrigeration engineer.• Start-up and operatin

Página 6 - Electrical data

14SERVICING REFRIGERATION COMPONENTSAny technician attending the machine for any purpose must bea fully qualified refrigeration engineer.WARNING: Befo

Página 7

15WARNING: Never open or disconnect any switch or circuitbreaker which will cut the supply to the heaters, unless the unitis to be shut down for lengt

Página 8

16Four evaporator tubes are swaged into the end plate and cannotbe removed. A dot punch mark in the end plate opposite eachone identifies each of them

Página 9

17For normal maintenance routines we recommend using 1 kg ofthe concentrated product, diluted to 10%, to treat a coil surfaceof 2 m2. This process ca

Página 10 - Fill valve

18TROUBLESHOOTING CHARTBelow we list a series of possible faults, along with the probable causes and suggested solutions. In the event of a unitmalfun

Página 12 - Control box A

CONTENTSPageStart-up checklist ...

Página 13

20Order No. 13193-76, April 1996. Supersedes order No.: New Printed on Totally Chlorine-Free PaperManufacturer reserves the right to change any produc

Página 14

START-UP CHECK LISTEquipment sold by: Contract No.:Installed by: Contract No.:Site address:Start-up date:Equipment type and serial numbers:Electrical

Página 15

430GV/30GY 025-03530GV/30GY 0203618688008006009509153636 363327202898380080060018009503636ABAB2103A-B: Clearance only required on one sideA-B: Clearan

Página 16

5Floor mounting• For unit mounting holes, weight distribution and centre of gravity coordinates, refer to the dimensionaldrawings supplied with the un

Página 17 - Wooden block

6Physical data30GV/30GY 020 025 030 035 044*** 049*** 059***Nominal cooling capacity 30GV* kW 51 66 73 97 132 146 193Nominal cooling capacity 30GY* kW

Página 18

7APPLICATION DATAMinimum and maximum evaporator water flow rates30GY/GV Min flow rate, l/s Max. flow rate, l/s020 1.2 4.8025 1.6 8.0030 1.6 8.0035 2.4

Página 19

8Preliminary checksBefore installing and connecting the unit check:- The required clearances for correct unit operation andmaintenance.- Size and loca

Página 20

9Fan speed adjustment tables30GV and 30GY 020Air flow 6 r/s 7 r/s 8 r/s 9 r/s 10 r/s 11 r/s 12 r/s 13 r/s 14 r/sl/s ESP kW ESP kW ESP kW ESP kW ESP kW

Comentários a estes Manuais

Sem comentários