Carrier 69NT40-511-1 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para não Carrier 69NT40-511-1. INSTRUCTIONS FOR HANDLING REEFER CONTAINERS Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - CONTAINERS

EIMSKIP - 2007INSTRUCTIONS FOR HANDLING REEFER CONTAINERS

Página 2 - 

1. Make certain that you are working with the correct container.2. Check that its temperature is in accordance with the shipping instruction

Página 3

4. Turn off the motor.5. Disconnect and roll up the cable.6. Replace the recorder disk before the container leaves the custody of the company. Send

Página 4

1. Make sure container stands on even ground.2. Make certain that the temperature is in accordance with the shipping instructions. 3. Turn

Página 5

5. Compare the seal number with the container list.6. Sign “STR” where the needle touches the recorder disk and initial the card.7. Remove the reco

Página 6 - 

1. Use only appropriate vehicles.2. Follow instructions about accepting deliveries (see Chapter 2) as appropriate.

Página 7

3. Transporting a reefer container for more than 2 hours without a power unit (clip-on or underslung) is prohibited. 4. Follow instructions regardin

Página 8 - 

For containers that do not have a recorder disk, the tempera- ture information is entered in the freezing unit’s com

Página 9

Insert a new recorder disk with the container number. The disk is inserted upside-down. Put the

Página 10 - 



Página 11

Stickers play an important role. They display information about the PTI, when the container was loaded, its destinatio

Página 12 - 

This booklet is intended for all those who work with Eimskip’s reefer containers at any stage of the transportation process. In this bookl

Página 13

1. Press MODE until it the number 5 begins to flash.2. Press ENTER until CONTROL SET flashes.3. Then press UP

Página 14 - 

 Press UP or DOWN simultaneously until DEF (DEFROST) lights up (approx. 30 secs). Records “Suppl

Página 15

Temperature settings1. Press SETPOINT. 2. Press F4. The indicator should be flashing on the lower screen.3. Enter

Página 16 - 

To start manual defrosting:Press the DEFROST key.If container controls are set for freezing the ventilation shaft must always be closed.

Página 17

Set control temperature: 1. Press UNIT ON/OFF.2. Wait 18 sec then press SET until SET-SPC appears on the lower panel. 3. Scroll with

Página 18 - 

Starting manual defrosting:Press MANUAL DEFROST to start manual defrosting.Starting automatic PTI: 1. Press UNIT ON/OFF to start the container machi

Página 19

Set control temperature:1. Press the arrow keys until the setpoint is at the desired temperature.2. Arrow up increases temperature

Página 20 - 

Switching to manual defrost: Press the MD (Manual Defrost) button on the control box. Read from the “Return” and “Supply” probes: Press RETURN

Página 21 - 

Yellow sealMeaning: Clean on the inside, intact, frames in place, ready for PTI inspec-tion.Sealed by Container Inspection, Metal Wo

Página 22 - 

White label with blue letters and borderMeaning: The container has been pre-trip inspected and is ready for use if the date is within the last 60 days

Página 23 - Press the DEFROST key

 Receiving full container loads – FCL . . . . . . . . . . . . . . . . 2 Stuffing . . . . . . . . . . . . . . . . . . .

Página 24 - 

Reading probesRead probes 1 and 2 in Carrier 69NT40 according to the following guidelines: 1. Open lid on control panel. 2.

Página 25 - Starting automatic PTI:

Connecting probes to the container’s microprocessorThe probes are connected to the container’s microprocessor by receptacles located inside the contai

Página 26 - 

Frozen cargo should be loaded to ensure that:- air circulation is guaranteed- the product is properly securedAir circulation must not

Página 27 - Press RETURN SUPPLY switch

Arrangement of 800x1200 mm (EURO) pallets in a 20 ft. reefer container.Arrangement of 1000x1200 mm pallets (EURO) in a 20 ft. reefer container. Arran

Página 28 - 

Refrigerating machinery and container function Dept Tel. Emergency tel. Fax Hours: 8:00 – 24:00 on weekdaysElectrical Workshop – E

Página 29

Exceptions – ProblemsNight and holiday watch at Sundahöfn, tel. 525-7100. Watchman at Sundahöfn has a list of telephone numbers that may be useful.Eve

Página 30 - 

EIMSKIP - 2007INSTRCTIONS FOR HANDLING REEFER CONTAINERS

Página 31 - Placing probes in product

1. Check the container for damages. Damaged units must be rejected if the defects could affect the goods. Have th

Página 32 - 

6. Check that the recorder disk or sticker is correctly filled in and the required information has been entered (see Chapters 8 and 9).7. Renew the

Página 33

1. Make sure the container stands on even ground.2. Check that you are handling the correct container and/or type of container.3. Check tha

Página 34 - 

8. Install probes as appropriate (see Chapter 15). 9. Do not overload the container. Check the maximum payload allowed.10. Check if the following p

Página 35 - Exceptions – Problems

1. A temperature reading should be taken three times every 24 hours, (unless a diff

Página 36 - INSTRCTIONS FOR

3. If a container is defrosting at the time of reading, record the temperature on the readout report and mark it with DF (Defrost). 4. If there are

Comentários a estes Manuais

Sem comentários