Carrier operating and maintanance Manual do Operador Página 26

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 25
Rev. __________
Date _________
2.8
3. Tilt
Raise the tilt control lever (second lever), raising the forward end of the
deck until the rear bumper rests firmly on the ground.
4. Roll
Raise the roll handle (first lever) and the deck will slide back. Continue this
operation until the approach plate of the deck has contacted the ground.
Make sure that the rear bumper and the approach plate are both in firm
contact with the ground before loading. There should be an equal weight
distribution between the rear bumper and the end of the deck.
5. Tilt (upper deck)
Raise the tilt control lever (fifth lever) for the upper deck. This will raise the
front end of the upper deck, raise fully. Free-spool the upper winch and
hook up to the equipment to be loaded.
**Note that tilting the upper deck will leave a gap between the
upper and lower decks.
6. Winch (upper deck)
Using the upper deck winch lever (sixth lever), winch the load up the lower
deck approximately three quarters of the way.
3
4
6
5
Vista de página 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 43 44

Comentários a estes Manuais

Sem comentários