E. Unloading (upper deck)
Note: The main deck should be empty prior to unloading the top
deck.
1. Tilting
Tilt the upper deck and the lower deck into alignment. Assure that the
upper deck winch cable is taut. Be sure that the load is partially unsecured
prior to titlitng, but maintain restraint against movement in every direction.
2. Winch (upper deck)
Release the remaining bindings, except for the winch cable. Winch the
load down onto the main deck until it it centered about half way on the main
deck.
3. Roll, Tilt, and Winch
Roll and tilt the lower deck until the approach tip and the bumper tubes are
firmly on the ground. Using the upper winch control, winch the load safely
to the ground. Block the vehicle or apply the emergency brake after the
load is safely on the ground.
4. Finish
Finish the process by winching the cable back onto the upper deck winch.
Then tilt the upper deck back into it’s stowed position. Proceed to do the
same process with the lower deck. Be sure that all chains, binders etc. are
secured in a toolbox prior to driving. Be sure that the pto is disengaged
prior to driving, as this may cause damage to the PTO.